beBee background
Professionals
>
Construction / Facilities
>
Mississauga
Muhammad Amjad

Muhammad Amjad

Project Controls Specialist and Coordinator
Mississauga, Ontario

Social


About Muhammad Amjad:

  • Extensive experience over ten years in Project Control for working oil & gas and industrial construction focus
  • Experienced in Planning & Cost engineering functions by application of Earned Value Management System (EVMS) and Primavera P6
  • Managed project budgets, analyzed budget variations, evaluated project trends and cost forecasts 
  • Responsible for monthly project control deliverables progress, accruals, key performance indicators, change management, cash flow reports, commitment reports, variance analysis and charts as per client’s requirement
  • In depth knowledge and hands CONVERO for cost control and Primavera for scheduling
  • Keep updates with New Trends & Techniques through Professional Development Programs, Seminars and Courses both in Virtual and Physical Environment.
  • Goal is to Demonstrate Behavioural and Technical Competency through Application of Knowledge, Skills and Experience to Deliver Projects by Managing Scope, Cost, and Time while Maintaining High Standards in Quality, Safety and Ethics.

Experience

  • Extensive experience over ten years in Project Control for working oil & gas and industrial construction focus
  • Experienced in Planning & Cost engineering functions by application of Earned Value Management System (EVMS) and Primavera P6
  • Managed project budgets, analyzed budget variations, evaluated project trends and cost forecasts 
  • Responsible for monthly project control deliverables progress, accruals, key performance indicators, change management, cash flow reports, commitment reports, variance analysis and charts as per client’s requirement
  • In depth knowledge and hands CONVERO for cost control and Primavera for scheduling
  • Keep updates with New Trends & Techniques through Professional Development Programs, Seminars and Courses both in Virtual and Physical Environment.
  • Goal is to Demonstrate Behavioural and Technical Competency through Application of Knowledge, Skills and Experience to Deliver Projects by Managing Scope, Cost, and Time while Maintaining High Standards in Quality, Safety and Ethics.

ACHIEVEMENTS:

  • Outstanding performance in M.Eng. GPA is 3.74 out of 4.25 from Concordia University, Montreal, Canada.
  • Certification of Association of Professional Engineer-Alberta-Canada

RELEVANT SKILLS AND EXPERIENCE

PeriodOrganizationDesignation
2017 to dateDuron Ontario Toronto, ONProject Control Specialist
2015 to 2017AMR EngineeringProject Control Specialist
2007 to 2015AMEC Americas Ltd (WOOD) Calgary-AlbertaProject Control Engineer
2006 to 2007AMR EngineeringCost Analyst
2004 to 2006Concordia University Montreal-CanadaMaster of Engineering
1995 to 2004Sambu Construction (South-Korea)Project Controls Engineer

 

Project Control Specialist

DURON Ontario Ltd      Mississauga Canada                                                                                  May 2017– to date

Projects for City of Toronto, Toronto Transit Commission (TTC) and various Industrial and Commercial Projects                                                                                                                                                 

 

  • Prepared budget and proposal for local projects
  • Prepared and assisted in the development, implementation and maintenance of project schedules using Primavera P6 
  • Gather data, validate and incorporate it into the project schedule, analyze schedule impacts and recommend corrective actions to be taken to avoid/mitigate cost and schedule overruns  by using P6
  • Developed and planned for systems required to demonstrate how projects will be executed and controlled
  • Analyse and monitor project cost and schedule performance ensuring that the projects will achieve planned objectives while minimizing the exposure to risks
  • Co-ordinate the preparation and development of multi-levelled and multi-disciplined involving civil, structural, electrical and mechanical project specific budgets and schedules
  • Preparing and assembling monthly reports, comparing current actual costs with budget costs, comparing current progress with work plan schedules, co-ordinating the investigation and explanation of variances, and forecasting significant variances and trends through monthly Project Status Reports (PSR) and Departmental Progress Reports (DPR)
  • Resolves technical problems encountered during the construction of the project 
  • Supervises field verification of materials and issue purchase order and checked third party PPC accordingly.
  • Reported on status of projects quantities, costs, schedules, project change requests, change orders, progress payment status.  
  • Developed and maintained a thorough working knowledge of applicable legislation, construction contracts, standards and regulations (General Conditions, and Special Provisions). 
  • Monitors the cost and budget performance during construction, as assigned 
  • Performs quality control inspections of completed work
  • Updated biweekly and monthly progress reports for client review
  • Managed project budgets, analyzed budget variations, evaluated project trends and cost forecasts 
  • Assisted to carry out prequalification of construction companies and crew

 

Project Control Specialist

Various Industrial and Commercial Projects

AMR Engineering Ltd Calgary Canada                                                                                                     2015 – 2017

 

Project Control Engineer/Coordinator

AMEC Foster Wheeler Calgary Canada                                                                                                         2007 – 2015

On Various Projects includes;

Construction of plant facilities for Oil Sands Project – for IOL/ExxonMobil, Syncrude, CNRL  ($900 Million USD),

-infrastructure & Industrial Projects, Construction of Roads & Industrial/Commercial Buildings

  •  Accumulate and compile accurate data to prepare and analyze project costs;
  • Established and maintaining a work break down structure (WBS) & cost breakdown structure (CBS) to monitor budget against incurred cost, commitments, forecast and trends for project scope
  • Developed project code structure of accounts and do appropriate modifications and revisions per engineering scope of work.
  • Coordinated with engineering & other source to collects required data for a specific discipline or other specialty application to determine right scope of work requirements.
  • Responsible to gather timely and accurate Incurred Cost (Value of Work Done) data
  • Reported Schedule Variance (SV), Cost Variance (CV), Productivity Factor, SPI & CPI
  • Tracked and Analyzed Engineering Man-Hours and Prepared Forecast Curve.
  • Prepared and maintained trend reports, cost status reports, engage in change management and maintain Change Order Log for reporting 
  • Calculated Estimate At Completion (EAC) & Budget At Completion (BAC) for Variance Analysis
  • Maintained Cost History sheets for every major equipment and Bulk material
  • Reviewed Change Requests, Change Orders and potential changes with Package Engineer, Contract Administrator and Area Manager as applicable and recommends appropriate actions to the Site Project Controls Lead
  • Prepare reports and documentation and provide proper backup in order to obtain Change Orders from the Owner and Subcontractor
  • Performed incurred cost in the system based on miles stone met and analysis for assigned commitment packages and make forecast cost flow for them.
  • Provided project controls expertise to related activities for projects in support of the planning and execution of operational requirements
  • Responsible for preparation, data quality, and timely issuance of project cost and progress reports 
  • Participated in earned value analysis activities and helped discipline leads in developing milestones (rules of credit) for engineering progress measurement 
  • Followed management of change procedure to develop and obtain approved of scope and forecast trends.
  • Responsible for monthly project control deliverables progress, accruals, key performance indicators, change management, cash flow reports, commitment reports, variance analysis and charts as per client’s requirements. 
  • Incorporated payment progress report (PPC) and performance reports submitted by the third parties into our Monthly Progress Reports.
  • Visited site to check progress against planned or claimed by subcontractors
  • Issue weekly QURR(Quantity and Unit Rate Report), Man-hours, progress and performance tracker reports
  • Managed all in direct sub-contracts such as camp, fuel, busing, maintenance, security, cleaning etc.
  • Managed funds allocation to different sub-contractors
  • Managed Field Material Requisition by sub-contractors to buy material at site
  • Checked, logged and monitored contractors invoices
  • Assisted in the preparation of PMC invoicing;
  • Carried out additional tasks such as Trend Coordinator from time to time
  • Liaison with Project Accounts with regard to the contract/actual rates and associated data.
  • Arranged project strategy coordination meetings.
  • Provided mentorship and guidance to intermediate/junior Cost Analyst

Scheduler Experience:

  • Provided support to the Project Scheduling team, Planning Manager, and Construction Manager by obtaining information and performing data entry
  • Gather data, validate and incorporate it into the project schedule, analyze schedule impacts and recommend corrective actions to be taken to avoid/mitigate cost and schedule overruns  by using P6
  • Prepared or assisted in the development, implementation and maintenance of project schedules using Primavera P6 
  • Compared current status versus established baselines and forecasts and contributing to the analysis and explanation of variances;
  • Monitor, review and report to the Project Manager and or clients, the schedule status of the project with regard to compliance to the construction contract specifications and other documents on a regular basis.
  • Assisted with setting up, tracking and analysis of engineering work-hours 
  • Assisted with the creation and review of tools and templates for the company 

 

Cost Analyst

Oil Sands Project

AMR Engineering Ltd Calgary Canada                                                                                                         2006 – 2007

Project:  Oil Sands Project – KEARL PLANT 2 – HYDROTRANSPORT STAGE 

consists of a plant facilities and supporting infrastructure 

 

Project Controls Engineer

Sambu Construction Ltd. (South Korea) Pakistan                                                                                                                 1995 - 2004

Construction of Dual Highways, Bridges & Industrial/Commercial Buildings-Client: National Highway Authority

  • Monitored and Supervised timely cost / status / trend reports for the management team & client
  • Developed Bid, Live and Baseline Schedules of Construction Projects
  • Updated Schedules, Modified Logic, Compared with Baseline Milestones for Effective Tracking
  • Analyzed Critical Path, Variance and Float for Schedule Management and Maintenance
  • Participated in estimate development, review and cost risk;
  • Prepared Request For Quotation packages from the main bid package for Sub contractors
  • Prepared Bill of Quantities from Bid documents and the costs for the same. 
  • Supervised approval of contractors invoices
  • Prepare utilization reports and budget versus actual man-hours and equipment-hours reports
  • Gathers Bill of Quantities of work completed and prepare cost reports
  • Verified Performance Analysis and Productivity Analysis Weekly, Bi-weekly and Monthly by using Earned Value Analysis and S-Curve
  • Participated in Project Budget Planning and Development.
  • Reviewed and tracked Scope Changes, monitored the overall project progress and analyzed the budget variances.
  • Coordinated with Engineers, Project Manager and Deputy Project Manager to prepare and generate Monthly Project Cost Reports.
  • Reviewed and commented the site schedule submitted by the contractors.
  • Prepared all data and information required to estimate the total cost of projects based on Schedules
  • Prepared the Construction Schedule, Master Schedule, Milestone Schedule and updated them with approved changes
  • Tracked and analyzed project man-hours and associated costs within management proprietary.

EDUCATION & TRAINING

Master of Engineering  (2006)

(Project Management, Project Planning & Controls, Estimation)

Concordia University Montreal Qc, Canada  
Planning and Scheduling PrimaveraEngineering College, Pakistan
Bachelor’s Degree in Civil Engineering (1994)University of Engineering, Pakistan                                           
P. Eng (Alberta)Registration # 92450

 

COMPUTER SKILLS

 

Microsoft Office (Word, Excel, PowerPoint), Primavera P6, CONVERO

 

PROFESSIONAL DEVELOPMENT:

  • Project Management Workshop (3-Days) 

      October 2010, Calgary, Canada 

  • Basic Course on P6 organized by AMEC in-house.
  • Workshops on & Cost Control organized by AACE, Calgary Alberta.
  • Monthly in-house Lunch & Learn Lectures/Presentations on a variety of topics concerning Planning, Cost Control and Cost Estimation.
  • Basic Course on P3 organized by Pakistan Engineering Congress (1-week)  

AFFILIATIONS:

Certification of Association of Professional

Education

Master in Civil Engineering 

Professionals in the same Construction / Facilities sector as Muhammad Amjad

Professionals from different sectors near Mississauga, Ontario

Other users who are called Muhammad

Jobs near Mississauga, Ontario

  • PowerON Energy Solutions

    Electrical Engineer

    2 hours ago


    PowerON Energy Solutions Toronto, Canada Full time

    Reporting to the Head of Electrification Solutions, you will be part of a team developing energy solutions for large business and institutional customers including electric vehicle charging, battery storage, solar PV and power generation. This role will be an instrumental part of ...


  • BEST WAY RENOVATIONS INC. Toronto, Canada

    Education: · Expérience: · Education · Secondary (high) school graduation certificate · or equivalent experience · Work site environment · Noisy · Tasks · Load, unload and transport construction materials · Erect and dismantle concrete forms, scaffolding, ramps, catwalks shorin ...

  • AutoTrader

    Performance manager

    2 hours ago


    AutoTrader Greater Toronto Area, Canada Full time

    · We are seeking an energetic and experienced Performance Manager. This highly motivated individual will be responsible for developing & maintaining existing customer relationships while driving performance with AutoSync's CRM product, Activix. · We are seeking a candidate that ...