About Ayman Girgis:

Summary:
Senior Project Controls, Planning & Scheduling Specialist with extensive hands-on experience and rounded skills in Project Controls, Planning & Scheduling, Primavera P6, Eng/ Project Mgmt, Cost Estimating, and Quantity Surveying.

Certified: Professional Engineer, Professional Quantity Surveyor (PQS), and Project Management Professional (PMP).

Experience in Project Controls/ Management, Cost/ Change management, Planning & scheduling on Primavera P6 Progress reporting, Tendering, Contracts, Budgeting/ Project Finance studies, Invoices, Coordination & execution
of EPCM tasks.


Skills:
Hands on experience in EPCM Capital projects in (North America, Persian Gulf, and Middle East). In Oil & Gas, Infrastructure, Buildings and Heavy Industrial projects. Experience in setting-up effective, scalable (fit for purpose) Project Controls systems for both FEL(s) and Execution stages specifically designed to baseline, integrate cost & schedule, with Risk & Progress, measure (KPI), and finally Closing out / Benchmarking as built records. Full mastery of Primavera P6, Cost Management Software Ecosys, Prism, and SAP and the Estimating process

Experience

Jul.2020 to Sep 2023- Suncor Energy - Calgary - Alberta

 

Project: Digitally Optimized Assets -DOA (CAD$ 200M) 

Scope of Work involved the deployment of digital analytics tools and sensors in 9 complex projects across Suncor assets to maximize production, optimize Maintenance, Reliability, and Safety to shift from reactive to proactive maintenance. 

My Role: Leading the implementation of Project Controls Systems to run portfolio dashboards including risks, changes, status updates, milestones, progress measurement and real-time views of cash-flow and Cost performance. 

 

Senior Planning & Cost Specialist

My work had contributed to a 12% budget reduction by de-risking the projects and guided leadership making informed decisions through:

  • Managed all aspects of Portfolio delivery, including costs, schedule, cash flow, interdependencies, and risks
  • I’ve centralized multiple PC deliverables (such as reports for: Cost, schedule, progress, ..) to drive consistency and increased productivity resulting-in considerable savings on the 3rd Parties consultant costs
  • Developed level3 P6 schedules integrating scopes of the 9 projects. Rolled it up to level 2, 1, & roadmaps.
  • Defined the Key Interface Milestones and touch points driving the projects Critical path and Performance.
  • Developed definitive bottom-up cost estimates, and measured cost performance accordingly
  • Managed cost control/trending function including change Mgmt, Scope Changes, Forecast / Variance analysis.
  • Collaborated with Black & Veach to baseline the level3 deliverables-based Engineering schedule on Primavera used to control and measure the FEED progress by EWP
  • Managed the change management process (PCN register), reflected the cost impact on the project EAC  
  • Managed Cost Control: Trending, Budget Transfers, Scope Changes, and Incurred/Forecast calculation
  • Managed the project risks to prioritize execution sequence with the Construction Mgr to optimize and reduce non-critical scopes of work
  • Integrated Sub-trades level 4 schedules with project master schedule (on level 3) in 4 weeks look ahead reports
  • Worked closely with the Construction team to optimize the scaffolding cycle and the use of the laydown areas.
  • Prepared as built cost (including final MTO) and as built schedule during the project close out phase
  • Closed out finally the active Vendors PO and prepared the Benchmarking data for rate of placement and ratios
  • Prepared Cash-flows, Cash-calls and Key Performance Indicators.
  • Managed Contingency draw down according the Project on-going risk profile evaluation
  • Led annual budget, business planning processes to prioritize projects and preserve the initial investment value

 

 

Nov 17 to June 20 - Suncor Energy – Calgary – Detroit - Madrid

Project: Coke Boiler Replacement (CAD$ 1,400M) 

Scope of Work EPC for the replacement of 3 coke-fired boilers with 2 efficient nat. gas cogeneration units, to generate 800 megawatts of reliable, low cost/carbon power to the Alberta grid..

My Role: Leading the implementation of Project Controls Systems from in Concept Selection, FEED, Detailed Eng, and Early Works site construction. My responsibility included working with 2 EPC houses Black & Veach (USA), and Tecnicas Reunidas (Spain) to develop packages for FEED and Detailed Engineering

 

Senior Cost Specialist

My work had led to the successful selection of the lowest responsible Bidder for both the FEED and Detailed Engineering phases:

  • Collaborated with the project team to evaluate and score Bids using unbiased criteria. 
  • Guided the Bid Winners in mapping their organization standards, procedures, and metrics with Suncor system.
  • Developed pre-gate Plans: PC controls plans, Schedule basis, Staffing plan, and Basis of Estimate.
  • Developed FEED class III estimate including preliminary MTO, work hours, and Indirect cost calculations
  • Worked with Tecnicas-Reunidas (TR) to setup-up rules of credit for performance metrics of the Execution stage. 
  • Developed work processes with TR to define Project WBS, Commodity Break down Structure (CBS), Schedule Levels of details, Management of Change, and Cash Flow projections.
  • Collaborated with TR to Develop the FEED estimate to an EPC execution Estimate by confirming final MTO, rate of placement, Modularization ratios, Allowance (Cut/waste/design/FX), Owner’s cost, and Indirects.
  • Used Earned Value Management Technique to bi-weekly measure the progress from Deliverables completion

 

 


 

Dec 2015 to Oct 2017- Suncor Energy - Fort McMurray - Alberta

 

Project: Fort Hill Infrastructure (CAD$ 1,200M) 

Scope of Work involved all the Infrastructure associated with the Fort Hill mine development. Including Non-Process Buildings, Roads, Earth moving, Lay down areas and Ware house, Undergrounds service, Pump stations… 

My Role: The implementation of Project Controls Systems during the Final Construction phase of the project including Final walkdown and Punch items 

 

Planning & Scheduling Specialist

My work had led to a 80M Budget savings as verified on the final closing out Cost report:

  • Rigorously managed the Resource loaded Construction schedule to accelerate critical tasks and balance Overtime spend with productivity for cost optimization.
  • Analyzed contractor level 4 schedule, verified it against the Execution plan path of construction.

Jan 2014 to Nov 2015 - Suncor Energy – Seoul (South Korea) -Calgary

 

Project: Secondary Extraction (CAD$ 2,400M) part of the overall Fort Hill 14 Billion Mine development

Scope of Work Involved the EPC work required in the “Secondary Extraction” area of Fort Hill to Engineer, Supply, and Install the Process units needed to remove solids and Solvent from the Primary Extraction Froth using a high-temperature paraffinic treatment to finally produce Bitumen. The Plant Capacity was 180k bpd

My Role: Management has engaged the South Korean firm SKEC to complete Front End Engineering Design (FEED) my role was to work with them in Seoul and Calgary offices to develop the Class III Estimate and level 3 schedule according to the Canadian Standards. In addition to the Cost/ Control work for the SKEC scope in the FEED Eng 

 

Cost and Schedule Lead

My work had resulted-in the completion of the Key Gate 3 deliverables required for project sanctioning that is the project Master Schedule, and the Class III Estimate

 

Gate 3 deliverables Accomplishments:

  • Conducted interactive planning sessions to develop the P6 baseline schedule and commodity/resource curves
  • Provided QA/QC audits of the Contractors scheduling processes/ quality, critical path. Checked compliance with Suncor work practices, initiated corrective measures.
  • Updated the PC sections of the PEP (PC plan, schedule basis, basis of Estimate, Cost summary, staffing plan…)
  • Collaborated with SKEC in the open book Estimating efforts to convert the FEED Estimate to EPC Lumpsum 
  • Audited Class III Estimate, reviewed rate of placements, Indirects to Direct Cost ratios, Work hours, Scope gaps, Equipment list, Long lead items, and Allowances for MTO, Cut & Waste, Design, rework.
  • Reviewed and Coordinated quantitative Risk analysis to calculate contingency. Reviewed ratios for Escalation (with the company market intelligence), ratios for capital spares, first fill, and Owner’s cost

 

Control of SKEC scope Accomplishments 

  • “Earned value technique” to integrated cost and schedule, and measure progress based on Eng deliverables
  • Implemented sound Cost Engineering principles to assess project performance using “Ecosys” and “SAP”

 

 


 

Feb 07 to Dec 2013- Suncor Energy - Calgary - Alberta

 

In Seven consecutive years I’ve held the following positions in Suncor Major Projects Business unit and worked on a variety of projects with different EPC houses:

 

  • Feb 07 – Jan 09: Lead Planner, Voyageur Project, FortMcmurray, worked with Ellis Don and Upside Engineering
  • Feb 09- Sep 2012: Project Controls Team Leader, Fire Bag Stage 4 project, worked with Jacobs
  • Oct 2012- Dec 2013: Planning Lead, Offsite & Pipeline in Voyageur Project

 

Main Accomplishments during the 7 years Assignment:

  • Led the development and implementation of project baseline schedules using Primavera P6.
  • Audited level4 subtrades schedules, streamlined the codes with Suncor schedule (level1, 2, and3)
  • Provided timely variance schedule analysis, early warning to mgmt on critical or near critical activities
  • Provided 4 weeks look ahead by Major contract and reported forecasted variance.
  • Prepared monthly updating of costs and resources, loaded schedules, and perform earned value management
  • Developed and maintained progress and performance, project schedule/cost baselines and variance analysis
  • Managed the setup, tracking and analysis of engineering hours according to rules of credit & deliverables.
  • Provided QA/QC of cost and scheduling processes, health, reports and utilization.

 

 


 

Aug 06 to Jan 07 (UAE - Dubai- Persian Gulf Area)

Position:                 Project Planning Manager

Company name:    Hill International

Project:                  Company Head office in Dubai

 

Jan 04 to July 06 (Qatar- Persian Gulf Area)

Position:                 Project Controls & Estimation Manager

Company name:    Gettco Contracting, Qatar - Doha

Project:                  Company Head office to manage centrally “project controls works” for multiple Petrochemicals, Industrial, and Commercial projects, with multiple clients such as Qatar Petroleum, Qatar Fuel, Qatargas, & Al Faisal Holding

 

Jan 1999 to December 03 (Egypt – Middle East)

 Position:                Senior Project controls Specialist (Cost & Schedule Control)

 

Projects:          Cairo International Airport -Renovation of transit hall No1& Construction of new annex (April 01- Dec 03). Rehab City project – Managed project Controls works for one the biggest residential and commercial development project in the Middle East (Jan 99- Mar 01). 

 Company name:   Marasem International for construction & Dev.

Education

Education

  1. Certified Professional Engineer (P.Eng.) – APEGA – Alberta - Canada
  2. Certified “Project Management Professional” (PMP) - PMI- USA
  3. Certified “Professional Quantity Surveyor” (PQS) – Canadian Institute of Quantity Surveyors,–  Canada
  4. Master of Science in Construction Engineering & Management, Faculty of Engineering, Cairo University
  5. Post-graduate diploma in construction Management Faculty of Engineering, Cairo University 
  6. Graduate of computer applications in project management, American University in Cairo
  7. B.Sc.  Civil Engineering – Benha University
  8. Grade 12 Diploma (French section), College De La Salle 

Professionals offering similar services to those of Ayman Girgis

Professionals in the same Construction / Facilities sector as Ayman Girgis

Professionales offering Project Management Services services

Professionales offering Planning & Scheduling services

Professionales offering Building Cost Estimators services

Professionales offering Project Management services

Professionals from different sectors near Calgary, Alberta

Other users who are called Ayman

Jobs near Calgary, Alberta

  • Hampton Inn & Suites

    maintenance worker, building

    Found in: Talent CA 2 C2 - 2 days ago


    Hampton Inn & Suites Calgary, Canada

    Education: · Expérience: · Education · Secondary (high) school graduation certificate · Tasks · Make adjustments and minor repairs to heating, cooling, ventilation, plumbing and electrical systems, and contact tradespersons for major repairs · Contact contractors for repairs an ...

  • JOEY Restaurant Group

    Cook, Closer

    Found in: Jooble CA O C2 - 2 hours ago


    JOEY Restaurant Group Calgary, AB, Canada Full time

    This is about you. Your passion, purpose and potential. In you we see care, drive, confidence and curiosity. When you join our team, you can expect intensity, excitement and energy. Through our culture of people development, we are committed to the continuous learning and growth ...

  • FAIRMONT

    Restaurant Manager, Hawthorn Restaurant

    Found in: Talent CA C2 - 14 hours ago


    FAIRMONT Calgary, Canada Full time

    Job Description · Restaurant Manager, Hawthorn Restaurant & Bar (12 month Contract) · As Restaurant Manager of Hawthorn Restaurant & Bar inside the iconic Fairmont Palliser Hotel, you are responsible for working alongside other Managers and the General Manager in the revitalizati ...