beBee background
Professionals
>
Engineering / Architecture
>
Markham
Iqbal Sipra

Iqbal Sipra

Consultant Prod.Technology/ Artificial Lifting

Services provided: Technical Designers

Markham, Ontario
(0)
$250 / hour
Approximate rate

Social


About Iqbal Sipra:

Sep 6,2022    

Dear Sir/Md’m

JOB OPPORTUNITY

 Prod.  Otimization Engr


 

Your recent advertisement on internet refers

I am working in Petrogas-Oman, since last four  year as Consultant Prod. Technology/ Artificial Lifting.

Over 42 Years experince in Oil Industry.I have been heavily involved in oil operations in the Middle East during my working career. I have executed several innovative techniques to increase overall oil production. I have enhanced production from wells by installing ESP and Gas lift systems. Extensive experience in planning, designing, and production of oil using state-of the-art technologies.


 

I am a competent Petroleum Engineer with the specialised knowledge in Artificial Lifting / Production Technology, having emphasis on ESPs. I am a recognised ESP expert, written/presented 8 SPE Papers (Houston/2002, Mealf Dubai/2003, Houston CT Workshop April/09).I have worked with world class Major Oil Companies in Middle East as Saudi Aramco  (for 3 ½ ) and Kuwait Oil Company for over 20 years , wherein I lead the Artificial Lifting Team, as Senior Petroleum Engineer. As Senior Contracts Engineer, I prepared contract documents on Artificial Lift Leasing out & Various Oil Services Contracts (as Centrilift, Halliburton, Schlumburger etc). The Artificial Lift Contract strategy in KOC was changed form Purchase to Leasing, on preparation of my Lease out document. I have worked in various aspects of Petroleum Engineering, mainly comprising as:Reservoir exploitation & Production optimization by Artificial Lift as, Submersible Pumps, Progressive Cavity Pumps and Gaslifting

  1. Design & Analysis of Oil/Gas Well testingWater shut-off /Chemical Treatment, Stimulation & Fracturing.
  2. Planning and Administration of Rig less wire line field operations
  3. Design and implementation of Completion & Workover programs
  4. Power Water Injection and Oil/Water production through Gaslift operation, Injectivity Decline studies
  • Analysis of routine surveys/ Well logging (Flowmeter, Pressure build up, Temperature)
  • Plant Operation (Process & Design of Oil/Gas Separation, Dehydration/Desalting facilities)
  •  I worked as Snr. Prod. Technologis/ Artificial Lift Specialist  in PDO, for 13 years. Prepared Study on Zauliyah Field (Feasible Artificial Lifting Mode), Prepared stimulation programs to boost water injection and oil production. Opptimised production in ESP operated wells, Carried out Sand Control (Gravel Pack/WWS Completions), Horizontal and Ultra Short Radius well completions & Smart well design. Worked over 79 wells in PDO/Rima field during last year (2003), reduced deferment to nil, restored 3500 m3/d oil, saved $ 2.0 million and scored 3 Shukran Awards.

 Carried out GL to ESP conversions  & has substantially optimised the field production. Enhanced ESP runlife/production (by 400 m3/d) in  five ZL wells by recommending installation of  Floater pumps/ VSDs. 

Worked as Consultanat to  PDO, in ESP Design, Operation, Maitenance and Optimisation. Carried out studies to enhance production,curtail Production Deferment due to ESP Tripping, Delayed  Downhole Installations and Lack of Equipment Availability.Increased Runlife by 30% on 750 ESPs installations ( by Centrilift, WoodGroup ESP and Reda). Improved Response Time to Trouble Shooting and resulting in 50 % reduction in Production Deferment. Prepared plan to increase ESP Population to 1250 by 2013. Carried out project form concept to commissioning and monitoring the  Project

Rja-18 Dump Flooding, commissioned on 25/3/09 

-Wire line Retrievable ESP, A shell/PDO Project, carried out successfully in RM-36

- Hihg GOR ESPs, wells having GLR upto 500 m3/m3 (Mbr-25,BK-4)

-ESP Sand  Management-ADV, 

-Y-Tool Installations ( RN-49,50, RM-165,67 &168) 

-MLM ESP Study-conducted, recommended to use ADV,GRE lined tbg, Antifoaming treatments at WH.Improve ESP RL From 520 days to 830 days.

Please give a favorable consideration to the attached resume. I look forward to hear from you soon.  in Toronto/Canada, or at the address shown above.

Thank you for your time.

Sincerely,

  Iqbal sipra     

85, Annina Crescent, 

Markham,

Ontario, L3R4S6-Canada

Web: iqpetroconultant.com

Experience

Mar, 11,2022    

Dear Sir/Md’m

JOB OPPORTUNITY

 Prod.  Otimization Engr


 

Your recent advertisement on internet refers

I am working in Petrogas-Oman, since last four  year as Consultant Prod. Technology/ Artificial Lifting.

Over 42 Years experince in Oil Industry.I have been heavily involved in oil operations in the Middle East during my working career. I have executed several innovative techniques to increase overall oil production. I have enhanced production from wells by installing ESP and Gas lift systems. Extensive experience in planning, designing, and production of oil using state-of the-art technologies.


 

I am a competent Petroleum Engineer with the specialised knowledge in Artificial Lifting / Production Technology, having emphasis on ESPs. I am a recognised ESP expert, written/presented 8 SPE Papers (Houston/2002, Mealf Dubai/2003, Houston CT Workshop April/09).


 

I have worked with world class Major Oil Companies in Middle East as Saudi Aramco  (for 3 ½ ) and Kuwait Oil Company for over 20 years , wherein I lead the Artificial Lifting Team, as Senior Petroleum Engineer. As Senior Contracts Engineer, I prepared contract documents on Artificial Lift Leasing out & Various Oil Services Contracts (as Centrilift, Halliburton, Schlumburger etc). The Artificial Lift Contract strategy in KOC was changed form Purchase to Leasing, on preparation of my Lease out document. 

I have worked in various aspects of Petroleum Engineering, mainly comprising as:


 

  1. Reservoir exploitation & Production optimization by Artificial Lift as, Submersible Pumps, Progressive Cavity Pumps and Gaslifting
  2. Design & Analysis of Oil/Gas Well testingWater shut-off /Chemical Treatment, Stimulation & Fracturing.
  3. Planning and Administration of Rig less wire line field operations
  4. Design and implementation of Completion & Workover programs
  5. Power Water Injection and Oil/Water production through Gaslift operation, Injectivity Decline studies
  • Analysis of routine surveys/ Well logging (Flowmeter, Pressure build up, Temperature)
  • Plant Operation (Process & Design of Oil/Gas Separation, Dehydration/Desalting facilities)


 

 I worked as Snr. Prod. Technologis/ Artificial Lift Specialist  in PDO, for 13 years. Prepared Study on Zauliyah Field (Feasible Artificial Lifting Mode), Prepared stimulation programs to boost water injection and oil production. Opptimised production in ESP operated wells, Carried out Sand Control (Gravel Pack/WWS Completions), Horizontal and Ultra Short Radius well completions & Smart well design. Worked over 79 wells in PDO/Rima field during last year (2003), reduced deferment to nil, restored 3500 m3/d oil, saved $ 2.0 million and scored 3 Shukran Awards.

 Carried out GL to ESP conversions  & has substantially optimised the field production. Enhanced ESP runlife/production (by 400 m3/d) in  five ZL wells by recommending installation of  Floater pumps/ VSDs. 

Worked as Consultanat to  PDO, in ESP Design, Operation, Maitenance and Optimisation. Carried out studies to enhance production,curtail Production Deferment due to ESP Tripping, Delayed  Downhole Installations and Lack of Equipment Availability.Increased Runlife by 30% on 750 ESPs installations ( by Centrilift, WoodGroup ESP and Reda). Improved Response Time to Trouble Shooting and resulting in 50 % reduction in Production Deferment. Prepared plan to increase ESP Population to 1250 by 2013. Carried out project form concept to commissioning and monitoring the  Project

Rja-18 Dump Flooding, commissioned on 25/3/09 

-Wire line Retrievable ESP, A shell/PDO Project, carried out successfully in RM-36

- Hihg GOR ESPs, wells having GLR upto 500 m3/m3 (Mbr-25,BK-4)

-ESP Sand  Management-ADV, 

-Y-Tool Installations ( RN-49,50, RM-165,67 &168) 

-MLM ESP Study-conducted, recommended to use ADV,GRE lined tbg, Antifoaming treatments at WH.Improve ESP RL From 520 days to 830 days.

Please give a favorable consideration to the attached resume. I look forward to hear from you soon. Toronto/Canada, or at the address shown above.

Thank you for your time.

Sincerely,

  Iqbal sipra     

85, Annina Crescent, 

Markham,

Ontario, L3R4S6-Canada

 

Web: iqpetroconsultant

Education

Professional Petroleum Engieer 

Professionals offering similar services to those of Iqbal Sipra

Professionals in the same Engineering / Architecture sector as Iqbal Sipra

Professionales offering Technical Designers services

Professionals from different sectors near Markham, Ontario

Other users who are called Iqbal

Jobs near Markham, Ontario

  • CORA CABACUNGAN

    housekeeper

    Found in: Talent CA 2 C2 - 6 days ago


    CORA CABACUNGAN Toronto, Canada

    Education: No degree, certificate or diploma · Experience: Will train · Work site environment · Non-smoking · Work setting · Optional accommodation available at no charge on a live-in basis. Note: This is NOT a condition of employment · Work in employer's/client's home · Tasks · ...

  • U.KTIONS INC

    framer-carpenter

    Found in: Talent CA 2 C2 - 4 days ago


    U.KTIONS INC Vaughan, Canada

    Education: · Expérience: · Education · Secondary (high) school graduation certificate · Work setting · Construction · Various locations · Renovation · Commercial · Residential · Tasks · Measure, cut, shape, assemble and join materials made of wood, wood substitutes, lightweight ...

  • 0000050007 Royal Bank of Canada

    Lead DevOps Engineer

    Found in: Talent CA C2 - 1 week ago


    0000050007 Royal Bank of Canada Toronto, Canada Full time

    Job Description · What is the opportunity? As a Lead DevOps Engineer/Technical Lead with expertise in CI/CD and Service Management, you will play a pivotal role in enhancing our software delivery pipelines, ensuring system reliability, monitoring and improving overall service qu ...